Operations Update

  • Significant new drilling results to generate further resource upgrades

  • Onsite Laboratory operational

  • Additional mining fleet mobilised and operating

  • Process plant due to start wet commissioning

Noble Mineral Resources (ASX: NMG) is pleased to announce significant assay results for recent drilling at its Bibiani project in Ghana, West Africa. These drilling results are confirmatory and extensional to the current mineralisation and are expected to lead to an upgrade to the Bibiani’s 2.26 Moz resources and 958,000 oz reserves.

Following the commissioning of the onsite Performance Laboratory (PL) in December 2011, the faster turnaround on assay results will accelerate results from drilling programs and hence resourcereserve calculations. Additional mining equipment has been mobilised to site to boost mining production ahead of the imminent wet commissioning of the process plant. Production is expected to ramp up to the 150,000 oz pa rate in 2012.

Recent results from resource definition and infill drilling

Some significant intercepts include:

  • Elizabeth

  • 4m @ 12.05 g/t from 76m

  • Grasshopper

  • 8m @ 1.42 g/t from 56m

  • Main Pit

  • 14m @ 4.13 g/t from 174m

  • 32m @ 1.48 g/t from 16m

  • 13m @ 2.73 g/t from 119m

  • Strauss

  • 4m @ 3.91g/t from 10m

  • 11m @ 1.88 g/t from 10m (including 3m @ 4.3 g/t)

  • Walsh

  • 6m @ 11.15 g/t from 35m (including 1m @ 37.62 g/t)

  • 20m@ 3.79 g/t from 36m

  • 6m @ 4.12 g/t from 38m

  • 6m @ 2.40 g/t from 46m

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

Email [email protected] Web www.nobleminres.com.au

1

==> picture [566 x 98] intentionally omitted <==

Elizabeth

The Elizabeth prospect lies along a quartz porphyry which splays out from the NE section of the Main pit in 040[o] magnetic direction. Exploratory drilling at Elizabeth prospect has uncovered two near surface oxide sub-parallel mineralised zones grading 5m @ 2.01g/t (15-20m) and 7m @ 4.32g/t (2431m) including 1 metre of 23.7g/t shoot. Further RC drilling is in progress to delineate the strike extensions of this intercept which occurred in hole number EL11_028. Hole EL11_053, 40m further on strike intercepted 4.0m @ 12.05g/t (76-80m). RC drilling is in progress to delineate the strike extensions of these intercepts.

Walsh-Strauss

In preparation for mining, infill grade control drilling at Walsh pit on a 10m X 10m grid has been completed with currently 30% of results outstanding. Strauss grade control drilling is now 90% completed and awaiting 20% of results. The backlog of assay results will be quickly cleared with the new onsite assay lab.

Grade control and extensional drilling for the Gap Pit located between Walsh and Strauss is in progress and further demonstrating the potential to link the pits together.

Prestrip mining has commenced at Strauss removing previous backfill and old waste dumps adjacent to the pits.

Aheman - Grasshopper

Drilling is in progress to investigate the full 500m strike length between the Aheman and Grasshopper pits. Two other near surface sub parallel mineralised oxide trends were intercepted with two fences of RC drilling 300m apart. These average 5m wide and grade up to 2.3 g/t. Initial structural interpretation infers that the mineralised corridor encompassing these two prospects might have been laterally displaced by the valley in between which could be the trace of the causative fault.

Mining has commenced at Aheman with the first ore grading ~1.3 g/t taken to the ROM pad to provide the commissioning material for the process plant crusher.

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

Email [email protected] Web www.nobleminres.com.au

2

==> picture [566 x 98] intentionally omitted <==

Main Pit

Big Mug lies to the North of the Bibiani Main pit. MP11_013 recorded 13m @ 2.73g/t (119-132m) including 9m @ 3.8g/t and MP11_016 recorded 8.0m @ 1.02g/t (18-26m). These holes boost the resource potential of the prospect.

South Hill is the continuation of the Bibiani Main pit to the South. MP10_015, 018 and 023 had intersections, 4m @ 1.15g/t, 2.0m @ 1.78g/t and 32m @ 1.48g/t respectively. These are infill holes in the provisional resource model.

Levee Material (Historic Tailings)

Mining of the Levee Material at Dam1 is continuing. Grade control samples taken at the mining face reported an average grade of 1.42g/t, which is encouraging compared to the 0.74g/t reserve grade recorded during exploration for Dams 1 & 2.

==> picture [347 x 260] intentionally omitted <==

Reclaiming Tails in Dam 1

Cape Three Points

Elevated assay values far above background numbers have been observed in geochemical soil sampling from the Nkroba prospect. These include Cr, Co, V, Ni, Mn, Fe, Cu and Al. Recent received assays point to elevated Chromium grades.

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

Email [email protected] Web www.nobleminres.com.au

3

==> picture [566 x 98] intentionally omitted <==

The other prospects at Tumentu, Morrison, Bartie and Satin have all tested positive for gold in soils and programs are being planned to conduct further soil tests and drilling.

Assay Laboratory

Since commissioning of the laboratory in December, the Performance Laboratory has reported 8,700 samples averaging 360 samples per day working a single dayshift. Nominal design capacity was achieved within one month of commissioning and with continious process optimisation, laboratory staff training and skills transfer for all the various areas of the laboratory, it is expected that third party samples could also be processed thus potentially lowering the unit rates paid by Noble.

Mining Equipment

Noble has mobilised additional mining equipment consisting of five (5) Komatsu 785-5 trucks, a Cat D9R Dozer and a Cat 16G Grader. This equipment adds to the Company’s existing fleet as it prepares to ramp up mining production.

==> picture [221 x 165] intentionally omitted <==

==> picture [220 x 165] intentionally omitted <==

Mining at Aheman and Cutback of Strauss Pit

Plant Update

As reported on 11 January, Noble has begun dry commissioning of the process plant with wet commissioning expected shortly.

Authorised by:

Wayne Norris Managing Director

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

Email [email protected] Web www.nobleminres.com.au

4

==> picture [566 x 98] intentionally omitted <==

Competent Person’s Statement

The information in this announcement that relates to Mineral Resource and Ore Reserve estimates is based on information compiled by Mr Mark Laing (BE (Hons) Mining) who is a Corporate Member of the Australasian Institute of Mining and Metallurgy. Mr Laing is employed by Noble Mineral Resources Ltd, and has sufficient experience which is relevant to the style of mineralisation being reported herein as Mineral Resources, Ore Reserves and Exploration Results to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr Laing consents to the inclusion in this announcement of the matters based on his information in the form and content in which it appears.

About Noble Mineral Resources Limited

Noble Mineral Resources Limited listed on the Australian Stock Exchange on 26[th] June 2008 with a focus on exploring for large-scale gold deposits in the world-class Ashanti Gold Belt in Ghana, West Africa. In November 2009, the Company entered into an agreement for the acquisition of the Bibiani Gold Mine , a project located in the Sefwi-Bibiani Gold Belt in Ghana, host to over 30 Million Ounces of gold. On July 20[th] 2010 the final Share Transfer Form was executed to consummate the purchase.

Noble’s other primary gold concessions are Exploration Licences at Cape Three Points, Brotet and Tumentu, which cover some 141.3km² and all are located within the world-class Ashanti Gold Belt in south western Ghana. Ghana is the second largest gold producer in Africa and is the 10[th] largest gold producing nation in the world, with annual production of approximately 2.9 Million Ounces. Noble’s on-going focus will be to expand the drilling program at Bibiani to target new shallow resources near the Bibiani Mine and adjacent tenements while still progressing the Cape Three Points, Brotet and Tumentu concessions within the Southern extension of the Ashanti Gold Belt. Initial exploration at Cape Three Points will be targeted towards the Satin Mine Project and the Morrison Project , both of which lie in an area of historic underground gold exploration. Noble believes that there is significant potential for the delineation of additional high-grade gold mineralisation relating to the down-plunge and strike extension to these zones. When added to the potential now available at Bibiani it will place Noble in a strong position to achieve its goal in building Australia’s next major gold mining house.

The Company recognises the Bibiani , Cape Three Points, Brotet and Tumentu concessions are relatively under explored, highly prospective projects and aims to rapidly redefine JORC-compliant resources for development.

ASX Code: NMG

www.nobleminres.com.au

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

Email [email protected] Web www.nobleminres.com.au

5

==> picture [566 x 98] intentionally omitted <==

Figure 1 – Results Area

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

Email [email protected] Web www.nobleminres.com.au

6

==> picture [566 x 98] intentionally omitted <==

Appendix 1 – Recent Drilling Results

Area Interval Aug/t Hole From Including Comments
Elizabeth 4.0m 12.05 EL11_053 76 Elizabeth
Grasshopper 8.0m 1.42 AMGR11_001 56 Grasshopper South Extension
Main Pit 14.0m 4.13 MP11_014 174 BigMug;Infill hole for Resource definition in BigMugmodel
13.0m 2.73 MP11_013 119 9m@ 3.8g/t BigMug;Infill hole for Resource definition in BigMugmodel
8.0m 1.02 MP11_016 18 BigMug;Infill hole for Resource definition in BigMugmodel
4.0m 12.00 MP11_007A 204 Main Pit;Confirmingdowndipextension mineralisation at eastern wall
4.0m 3.66 MP11_007A 224 Main Pit
32.0m 1.48 MP10_023 16 Mainpit;South Hill
4.0m 1.15 MP10_015 4 Main Pit,South Hill;Infill hole for Resource definition in BigMugmodel
2.0m 1.78 MP10_018 10 1m@ 3.0g/t Mainpit;South Hill
Strauss 11.0m 1.88 STGC_100 10 3m@ 4.30g/t Straussgrade control
5.0m 1.29 STGC_054 17 Straussgrade control
4.0m 1.03 STGC_056 15 Straussgrade control
4.0m 1.34 STGC_057 37 Straussgrade control
4.0m 2.39 STGC_064 27 Straussgrade control
4.0m 3.91 STGC_111 10 Straussgrade control
5.0m 1.29 STGC_054 17 Straussgrade control
3.0m 1.26 STGC_101 15 Straussgrade control
3.0m 1.21 STGC_098 34 Straussgrade control
3.0m 2.50 STGC_099 14 1m@ 5.97g/t Straussgrade control
Walsh 20.0m 3.79 WAGC_033 36 Walshgrade control
18.0m 1.28 WAGC_064 13 Walshgrade control
12.0m 1.60 WAGC_054 26 Walshgrade control
19.0m 0.66 WAGC_117 2 5m@ 1.01g/t Walshgrade control
6.0m 11.15 WAGC_187 35 [email protected]/t Walshgrade control
6.0m 4.12 WAGC_001 38 Walshgrade control
6.0m 2.4 WAGC_029 46 Walshgrade control
6.0m 4.12 WAGC_001 38 Walshgrade control
6.0m 2.40 WAGC_029 46 Walshgrade control
4.0m 9.73 WAGC_022 19 Walshgrade control
4.0m 1.15 WAGC_047 2 Walshgrade control
4.0m 1.32 WAGC_063 35 Walshgrade control

All assays are bottle roll cyanide leach on a 1kg charge and do not include any fire assays of nonCyanide soluble residue. Analysis has been undertaken by Performance Laboratory at Bibiani and Intertek Laboratories Ltd at their Tarkwa laboratory.

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

Email [email protected] Web www.nobleminres.com.au

7

==> picture [566 x 98] intentionally omitted <==

Appendix 2a – March 2010 JORC Mineral Resource Estimate

TONNAGE GRADE CONT'D GOLD
0.5 g/t cut-off
Tonnes (Au g/t) Ounces
Measured 6,560,000 2.05 430,000
Indicated 13,370,000 1.77 760,000
BIBIANI MAIN PIT
Total M&I 19,920,000 1.86 1,190,000
Inferred 13,060,000 1.89 790,000
Total 32,980,000 1.87 1,980,000

Global Mineral Resource Estimate based on a cut-off grade of 0.5g/t

Appendix 2b – November 2011 JORC Resource Estimate

TONNAGE GRADE CONT'D GOLD
SATELLITE AREAS 0.4 g/t cut-off
Tonnes (Au g/t) Ounces
Measured - - -
AHEMAN Indicated 607,500 0.73 14,300
Inferred - - -
Measured 1,748,000 1.68 94,400
WALSH-STRAUSS
PRELIMINARY
Indicated 2,430,000 1.12 87,500
Inferred 6,000 1.69 300
Measured - - -
GRASSHOPPER Indicated 433,200 1.25 17,400
Inferred 4,800 1.20 200
Measured - - -
OLD TAILINGS* Indicated 2,860,200 0.70 64,000
Inferred - - -
Total 8,089,700 1.07 278,100

Global Mineral Resource Estimate based on a cut-off grade of 0.4g/t

  • Cut-off grade 0.0g/t

TOTAL RESOURCES = 41.1Mt @ 1.71 g/t (2.26Moz)

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

Email [email protected] Web www.nobleminres.com.au

8

==> picture [566 x 98] intentionally omitted <==

Appendix 3a – Bibiani Main Pit Proved and Probable Ore Reserves as at June 2011

Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011
Oxide Fresh Fill Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs
Proved 5,020 2.17 349 5,020 2.16 349
Probable 360 1.34 16 6,280 2.02 407 340 1.73 19 6,980 1.97 441
Total 360 1.34 16 11,300 2.08 756 340 1.73 19 12,000 2.05 790
Derived from Measured and Indicated Mineral Resources usinga cut‐offgrade of 0.6g/t

Appendix 3b – Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves as at October 2011

Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011

Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011
Oxide Transition Sulphide Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs
Proved 181 1.30 8 132 1.70 7 753 2.22 54 1,065 2.00 69
Probable 448 1.39 20 172 1.71 9 102 2.05 7 722 1.56 36
Total 628 1.36 28 303 1.70 17 855 2.20 61 1,787 1.82 105
Derived from Measured and Indicated Resources usinga cut‐offgrade of 0.5g/t

Appendix 3c – Tailings Deposits Probable Ore Reserves as at November 2011

Bibiani Tailings Deposits Probable Ore Reserves – November 2011

Bibiani Tailings Deposits Probable Ore Reserves – November 2011 Bibiani Tailings Deposits Probable Ore Reserves – November 2011 Bibiani Tailings Deposits Probable Ore Reserves – November 2011 Bibiani Tailings Deposits Probable Ore Reserves – November 2011
Deposit Tonnes Grade Cont’d Gold
Kt Au(g/t) Kozs
Dams 1 & 2 850 0.74 20
Levees 6 & 7 2,030 0.65 43
Total 2,880 0.68 63

TOTAL RESERVES = 16.7Mt @ 1.79 g/t (958,000oz)

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

Email [email protected] Web www.nobleminres.com.au