ACROW LIMITED Capital/Financing Update 2011

Nov 13, 2011

64288_rns_2011-11-13_34b15f94-c377-4623-9975-6786dc235424.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [567 x 26] intentionally omitted <==

==> picture [567 x 25] intentionally omitted <==

==> picture [567 x 26] intentionally omitted <==

==> picture [567 x 25] intentionally omitted <==

==> picture [567 x 26] intentionally omitted <==

==> picture [567 x 25] intentionally omitted <==

November 14, 2011

Noble Prepares for Production 2.26Moz Resource 958,000oz Reserve

  • Interim maiden resource of 278,000oz and 168,000oz reserve at Walsh to Grasshopper satellite deposits and historic tailings

  • First two years mill feed from satellite pits confirmed

  • Further resource upgrades expected from ongoing exploration at additional satellite pits

Noble Mineral Resources (ASX: NMG) is pleased to announce an upgrade to the resources and reserves at its Bibiani project in Ghana, West Africa resulting from drilling over the past 12 months at the Aheman, Grasshopper, Walsh and Strauss prospects.

The latest estimate takes the total resource calculation for the Bibiani Project from 1.98Moz to 2.26Moz including the Bibiani main pit, Walsh to Grasshopper satellite pits and the historic tailings. Reserves have been upgraded from 790,000oz to 958,000oz. Production is expected to ramp up to an annualised rate of 150,000oz pa in 2012.

The satellite pits between Walsh and Grasshopper which cover a 3km strike length and have relatively shallow mineralisation have been the focus of Noble’s efforts due to their proximity to the treatment plant site. These satellite pits will provide mill feed for approximately the first two years with further potential from existing additional satellite pits which are also in close proximity to the processing facility.

In addition there is significant resource and reserve available in the historic tailings levees and dams. This will be the first source of low cost mill feed on start-up. The area of the oldest dams is planned to be the site for a waste dump for the main pit which required the removal of the tailings.

The strategy of commencing production from the satellite pits allows Noble time to maximise the full resource potential of the Bibiani Main Pit area where exploration continues to develop resources not recognised by previous operators.

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Email [email protected] Facsimile +61 (0)8 9474 6772 Web www.nobleminres.com.au

1

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 26] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

Walsh-Strauss Gap

The resources in the area between the Walsh and Strauss Pits, the “Gap”, are largely preliminary with drilling to 20m x 20m drill coverage continuing. The development of the resource model in these areas is still in process with much of the material in the Indicated category likely to be converted to Measured status.

Drilling from the Gap area has been encouraging, with a number of areas of significant grades being intercepted. The shallower areas have been captured by the open pit optimisations with the deeper areas representing targets for underground operations after the completion of the open pit workings.

The Walsh to Grasshopper satellite areas are a complex interaction of northeast-southwest and east-west trending structures, with the highest volume of strongly mineralised material being on the intersections of these structures. This is borne out by the structural work done by Dr Ian Basson of Tech Consulting in June this year. The dominant structures are related to but separate from the Bibiani shear, with slightly more favourable treatment characteristics in the processing plant.

The area to the south of Walsh area has a number of high grade intersections in the drilling at depth. Mineralisation is not closed at depth anywhere along strike to Strauss and appears to become more discrete and higher grade within the structures with depth.

Bibiani Main Pit

Noble is currently conducting a significant drilling programme on the full length of the Bibiani Main Pit. This work will be collated and updated and in conjunction with the structural information gained in June used to re-assess the Bibiani resource, with a target date for the update to be completed in mid-2012.

==> picture [325 x 41] intentionally omitted <==

Drilling around the Bibiani Main Pit

==> picture [325 x 40] intentionally omitted <==

==> picture [325 x 41] intentionally omitted <==

==> picture [325 x 40] intentionally omitted <==

==> picture [325 x 41] intentionally omitted <==

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Email [email protected] Facsimile +61 (0)8 9474 6772 Web www.nobleminres.com.au

2

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 26] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

Assay Laboratory

As a result of the significant problem with slow assay laboratory turn-around times industrywide in Ghana, Noble has commissioned Performance Laboratories Ltd to establish an assay laboratory adjacent to the Bibiani mine site.

Performance Laboratories personnel are currently on site with the building works well under way following a delay of several weeks due to industrial action in South Africa. It is expected that the first assays will be processed before the end of the current quarter. This is expected to bring the turn-around times for drilling results down from several weeks with the current arrangements to approximately 5 days.

==> picture [342 x 38] intentionally omitted <==

==> picture [342 x 38] intentionally omitted <==

==> picture [342 x 39] intentionally omitted <==

==> picture [342 x 38] intentionally omitted <==

==> picture [342 x 38] intentionally omitted <==

==> picture [342 x 38] intentionally omitted <==

Mining Equipment

In preparation for the start of the mining Noble has been sourcing and purchasing essential equipment for the mining fleet. The initial fleet consists of several excavators, trucks and earthmoving equipment. Some of the equipment is already on site at Bibiani and the rest is being delivered over the coming weeks.

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

3

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 26] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

==> picture [378 x 39] intentionally omitted <==

==> picture [378 x 40] intentionally omitted <==

==> picture [378 x 40] intentionally omitted <==

==> picture [378 x 39] intentionally omitted <==

==> picture [378 x 40] intentionally omitted <==

==> picture [378 x 39] intentionally omitted <==

==> picture [378 x 39] intentionally omitted <==

==> picture [378 x 40] intentionally omitted <==

==> picture [378 x 39] intentionally omitted <==

==> picture [378 x 40] intentionally omitted <==

==> picture [378 x 40] intentionally omitted <==

==> picture [378 x 38] intentionally omitted <==

Authorised by:

Wayne Norris Managing Director

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

4

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 26] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

About Noble Mineral Resources Limited

Noble Mineral Resources Limited listed on the Australian Stock Exchange on 26[th] June 2008 with a focus on exploring for large-scale gold deposits in the world-class Ashanti Gold Belt in Ghana, West Africa. In November 2009, the Company entered into an agreement for the acquisition of the Bibiani Gold Mine , a project located in the Sefwi-Bibiani Gold Belt in Ghana, host to over 30 Million Ounces of gold. On July 20[th] 2010 the final Share Transfer Form was executed to consummate the purchase.

Noble’s other primary gold concessions are Exploration Licences at Cape Three Points, Brotet and Tumentu, which cover some 141.3km² and all are located within the world-class Ashanti Gold Belt in south western Ghana. Ghana is the second largest gold producer in Africa and is the 10[th] largest gold producing nation in the world, with annual production of approximately 2.9 Million Ounces. Noble’s on-going focus will be to expand the drilling program at Bibiani to target new shallow resources near the Bibiani Mine and adjacent tenements while still progressing the Cape Three Points, Brotet and Tumentu concessions within the Southern extension of the Ashanti Gold Belt. Initial exploration at Cape Three Points will be targeted towards the Satin Mine Project and the Morrison Project , both of which lie in an area of historic underground gold exploration. Noble believes that there is significant potential for the delineation of additional high-grade gold mineralisation relating to the downplunge and strike extension to these zones. When added to the potential now available at Bibiani it will place Noble in a strong position to achieve its goal in building Australia’s next major gold mining house.

The Company recognises the Bibiani , Cape Three Points, Brotet and Tumentu concessions are relatively under explored, highly prospective projects and aims to rapidly redefine JORC-compliant resources for development.

ASX Code: NMG www.nobleminres.com.au

Competent Person’s Statement

The information in this announcement that relates to Mineral Resource and Ore Reserve estimates is based on information compiled by Mr Phillip Schiemer (BSc (Hons), Geology and Geophysics), who is a Corporate Member of the Australasian Institute of Mining and Metallurgy and a member of the Australian Institute of Geoscientists. Mr Schiemer is employed by Noble Mineral Resources Ltd, and has sufficient experience which is relevant to the style of mineralisation being reported herein as Mineral Resources, Ore Reserves and Exploration Results to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr Schiemer consents to the inclusion in this announcement of the matters based on his information in the form and content in which it appears.

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

5

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 26] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

Figure 1 – Results Area

==> picture [425 x 35] intentionally omitted <==

==> picture [425 x 35] intentionally omitted <==

==> picture [425 x 36] intentionally omitted <==

==> picture [425 x 35] intentionally omitted <==

==> picture [425 x 35] intentionally omitted <==

==> picture [425 x 35] intentionally omitted <==

==> picture [425 x 35] intentionally omitted <==

==> picture [425 x 36] intentionally omitted <==

==> picture [104 x 152] intentionally omitted <==

==> picture [425 x 172] intentionally omitted <==

----- Start of picture text -----

Walsh to Grasshopper
Satellite Pits
----- End of picture text -----

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Telephone +61 (0)8 9474 6771 Email [email protected] Facsimile +61 (0)8 9474 6772 Web www.nobleminres.com.au 6

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 26] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

Appendix 1a – March 2010 JORC Mineral Resource Estimate

TONNAGE GRADE CONT'D GOLD
0.5 g/t cut-off
Tonnes (Au g/t) Ounces
BIBIANI MAIN PIT Measured 6,560,000 2.05 430,000
Indicated 13,370,000 1.77 760,000
Total M&I 19,920,000 1.86 1,190,000
Inferred 13,060,000 1.89 790,000
Total 32,980,000 1.87 1,980,000

Global Mineral Resource Estimate based on a cut-off grade of 0.5g/t

Appendix 1b – November 2011 JORC Resource Estimate

TONNAGE GRADE CONT'D GOLD
SATELLITE AREAS 0.4 g/t cut-off
Tonnes (Au g/t) Ounces
AHEMAN Measured - - -
Indicated 607,500 0.73 14,300
Inferred - - -
WALSH-STRAUSS
PRELIMINARY
Measured 1,748,000 1.68 94,400
Indicated 2,430,000 1.12 87,500
Inferred 6,000 1.69 300
GRASSHOPPER Measured - - -
Indicated 433,200 1.25 17,400
Inferred 4,800 1.20 200
OLD TAILINGS* Measured - - -
Indicated 2,860,200 0.70 64,000
Inferred - - -
Total 8,089,700 1.07 278,100

Global Mineral Resource Estimate based on a cut-off grade of 0.4g/t * Cut-off grade 0.0g/t

TOTAL RESOURCES = 41.1Mt @ 1.71 g/t (2.26Moz)

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

7

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 26] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

==> picture [566 x 25] intentionally omitted <==

Appendix 2a – Bibiani Main Pit Proved and Probable Ore Reserves as at June 2011

Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011 Bibiani Main Pit Proved and Probable Ore Reserves – June 2011
Oxide Fresh Fill Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs
Proved 5,020 2.17 349 5,020 2.16 349
Probable 360 1.34 16 6,280 2.02 407 340 1.73 19 6,980 1.97 441
Total 360 1.34 16 11,300 2.08 756 340 1.73 19 12,000 2.05 790
Derived from Measured and Indicated Mineral Resources usinga cut‐offgrade of 0.6g/t

Appendix 2b – Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves as at October 2011

Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011
Oxide Transition Sulphide Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs
Proved 181 1.30 8 132 1.70 7 753 2.22 54 1,065 2.00 69
Probable 448 1.39 20 172 1.71 9 102 2.05 7 722 1.56 36
Total 628 1.36 28 303 1.70 17 855 2.20 61 1,787 1.82 105
Derived from Measured and Indicated Resources usinga cut‐offgrade of 0.5g/t

Appendix 2c – Tailings Deposits Probable Ore Reserves as at November 2011

Bibiani Tailings Deposits Probable Ore Reserves – November 2011 Bibiani Tailings Deposits Probable Ore Reserves – November 2011 Bibiani Tailings Deposits Probable Ore Reserves – November 2011 Bibiani Tailings Deposits Probable Ore Reserves – November 2011
Deposit Tonnes Grade Cont’d Gold
Kt Au (g/t) Kozs
Dams 1 & 2 850 0.74 20
Levees 6 &7 2,030 0.65 43
Total 2,880 0.68 63

TOTAL RESERVES = 16.7Mt @ 1.79 g/t (958,000oz)

Noble Mineral Resources Ltd 15 Bowman Street South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

8